4.18.2010

Picture Time

Things are going well. Mechanical, electrical and plumbing rough-in starts Wednesday.


from the dining room, looking into kitchen:
looking at living room and front door:
from 2nd floor landing, looking into kids bedroom:
Lg bedroom and bathroom, looking out to the backyard:
from roof:

4.11.2010

Upstairs Bath Components

I can't bring myself to call it the Master Bath. Anyway, it will have these in it:

Duravit D-Code Tub. Will have white tile on sides rather than apron.



Kohler Stillness Tub/Shower controls. Thermostatic valve w/separate volume control. Will include tub spout, shower head and hand shower.



Toto Aquia II toilet. It's dual-flush and fairly inexpensive. I really wanted one of these just to confuse house-guests.

Ikea Norrviken sink/Godmorgon cabinet. Same reason we got most of the other Ikea stuff, it's practical and cheap and it looks pretty good. Other sinks that looked a little nicer were 5x as expensive.

4.07.2010

House is Stripped and Wet


Apparently, the roofer is ready to go. He's just waiting for the weather to turn around i.e. for the rain to stop, and he'll start working.

It looks like today will be nice.

The stairs to the roof should be framed soon. Windows going in next week.