7.08.2010

1st Floor

Yikes, it's been a minute since the last post. Walls are primed and paneling on the downstairs "cube" is complete. The sub-floor is STILL too wet to install hardwood (salvaged doug fir). We moved it into house though so the moisture-content will match up. We're hoping it will all go in next week. Kitchen cabinets are being assembled off-site. The progress feels slow, but we're inching closer to the move-in date.






0 comments:

Post a Comment