7.08.2010
1st Floor
Yikes, it's been a minute since the last post. Walls are primed and paneling on the downstairs "cube" is complete. The sub-floor is STILL too wet to install hardwood (salvaged doug fir). We moved it into house though so the moisture-content will match up. We're hoping it will all go in next week. Kitchen cabinets are being assembled off-site. The progress feels slow, but we're inching closer to the move-in date.





Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment