For the first time since we started, I'm not going to the house everyday anymore. The pace of things has slowed down significantly, and it's too excruciating for me to take.
Next week, the panelling around the center container should go up, bath tile installation is scheduled to start tomorrow. Interior doors for the bedrooms have already been hung, so we are making some progress. Andrew (our builder) assures me that this is a tough time in any project. The slowdown is normal.
The floor is still a bit too moist to install the hardwood.
I've taken to day dreaming about and planning my garden. Looks like I'll have 120 sq. ft. on one side of the front yard, and possibly half that on the other (assuming I'm willing to plant some stuff in a light shade, since there's a tree there).
I think I'll get trough for the roof deck, and plant all my herbs up there.
0 comments:
Post a Comment