Things are going well. Mechanical, electrical and plumbing rough-in starts Wednesday.
from the dining room, looking into kitchen:
looking at living room and front door:
from 2nd floor landing, looking into kids bedroom:
Lg bedroom and bathroom, looking out to the backyard:
from roof:
4.18.2010
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment